Skip to main content
Orangebox US Resources Help Center home page Orangebox US Resources
  • Submit a request
  • Sign in
  • Sign in
  • Submit a request
  1. Orangebox US Resources
  2. On the QT

On the QT

Assembly Instructions

  • On the QT Assembly Instructions - Americas
  • On the QT Door Handle Hardware must be torqued to 17 inch pounds or 2 NM
  • Retrofiting a shelf into the QT
  • Baffle Assembly Instructions
  • Lounge Assembly Instructions
  • Tall Worksurface Assembly Instruction

Installation Videos

  • QT Install Videos - Americas Version

Troubleshooting

  • Moving an On the QT Phonebooth within a Building
  • Install Changes to On The QT-Required Tip & Tricks for OB1QT04OBS-RHT Phone Booth
  • On The QT Aluminum Trim Pieces Around the Door and Window - How to Tell if They are in the Correct Location
  • Touch Up Paint for On the QT
  • Adjusting PIR Sensor Timing (Units shipped prior to March 2023)
  • On the Qt Door Handle Screw Replacement

Resources

  • On the QT Tech Doc -
Orangebox US Resources
Powered by Zendesk