To begin, refer to the Air3 installation videos and written instructions. Using the videos and written instructions as a base, this article adds specific instructions for the Air23.
- Assemble the hoop, making all the wired connections and install the heat detector.(see step 2 video)
- Stand up the hoop and attach both left and right screens. (see step 3 video) If the pod has an over the fabric monitor bracket, that screen will attach to the power side of the hoop. If the pod has a whiteboard, that screen attaches to the switch side of the hoop.
- Remove the grey seals from each vertical hoop that faces the rear glass frame.
- Open the 1/2 pod kit and locate the 6 enclosed bolts.
- Assemble the rear glass frame and attach to the hoop using the longer bolts from the 1/2 pod kit. The inner slots of the rear glass frame will line up on the hoop.
- Cut the left & right bung so they will fit against the hoop.
- Install front glass frame, fan unit, actuators and roof sections as normal. (see step 5-8 videos)
- Install drive arms on actuators using special hardware. (included with actuator)
- Install grey seal from 1/2 pod kit to close the gap between the rear glass frame and the hoop.
- Install corner caps from the 1/2 pod kit with adhesive tape.
1/2 pod kit contains 6 longer screws, grey seal, 2 corner caps with adhesive tape.
Comments
0 comments
Please sign in to leave a comment.