Skip to main content
Orangebox US Resources Help Center home page Orangebox US Resources
  • Submit a request
  • Sign in
  • Sign in
  • Submit a request
  1. Orangebox US Resources
  2. Air³

Air³

Assembly Instructions

  • Air3 Pods – Installation Instructions & Requirements (Americas)
  • Additional Assembly Instructions Unique to Air23
  • Air3 Over the Upholstery Monitor Bracket Instructions
  • Whiteboard Assembly Instructions

Installation videos

  • Air3 Installation Videos

DO IT RIGHT WITH TORQUE AND TOOLS

  • Air3 Required Tools
  • Door Roller bolts must be torqued to 124 inch pounds or 14nm
  • Air3 Jig Template Layout

Seismic Information

  • Air3 Seismic Kit Installation Instructions
  • Air3 Seismic Information

Air3 User Guide

  • Air3 User Guide
  • Troubleshooting
  • Cleaning & Routine Care
  • Safety & Operating Guidelines
  • Control Panel & Operation

Fan System

  • Air3 New Air Circulation System

Heat/Fire/Sprinkler Information

  • Genco Alternative Heat Detector Instructions
  • Air3 Sprinkler head Integration

Service Insights

  • Switch Button Replacement Instructions-Air3
  • Teardown and Relocation of an Air3 Pod
  • Air3 Actuator Reset Instructions
  • Air3 Cleaning & Maintenance
  • Air3 Upholstery panel Clip Placement
  • Air3 Actuator Settings
See all 7 articles

Resources

  • Air³ Pre Order Checklists
  • AIR3 COLOR MATCHED PAINT
  • AHJ Fire Requirements-Tech Document
  • Electrical System & Power Connectivity
  • Air3 Glass Sizes and Part Numbers
  • Installing Air3 pods Back-to-back, or up Against a Wall

Air29 Archive

  • Air29 special steps for installing roof sections
  • Air29/air27 Hoop to Hoop Connection
Orangebox US Resources
Powered by Zendesk